ASCA Sequence 87009000 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: A1060_1
- Nominal Pointing (degrees)
- R.A.=158.849 Dec.=-27.232
- Lii=269.147 Bii=26.571
- Observation Date: December 19, 1999
- Duration: 61.6 kiloseconds
(with 4 kiloseconds of telemetry gaps)
- Approximate SIS Exposure:
20.6 kiloseconds
(approximately 7% with telemetry saturated)
- Approximate GIS Exposure:
24.9 kiloseconds
Processing Information
- Sequence Version: 001
- Processing Version: 7.3.8
(Revision 2)
- FTOOLS Version: 4.2.b
- Processing Date: January 21, 2000
- GIS Secular Gain Calibration Date: October 7, 1999
- GIS Gain Map Calibration Date: April 1, 1999
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
NONE
Japan Principal Investigator
MR HAJIME EZAWA
DEPARTMENT OF PHYSICS
UNIVERSITY OF TOKYO
7-3-1 HONGO
BUNKYO-KU, TOKYO 113
JAPAN
EZAWA@PHYS.METRO-U.AC.JP